ORP "Kraków"
type: river monitor
class: Kraków (type 1923)
Building
shipyard: Polskie Fabryki Maszyn i Wagonów L. Zieleniewski With.And., Stocznia in Cracow
the keel laying: 1924
run on water: 1926
completion: 28.08.1926
inclusion in the services: 15.10.1926
sunk: 11.9.1941
Size
max.length: 35,00 m
max.width: 6,00 m
draft: 0.39 m
displacement: 70,3 t (after a conversion of 90 t)
Drive
2x 6-cylinder engine sitting volleyball-Kromhout with a total output of 120 HP
2 screws
max.speed: 6,75 knts (12.5 km/h)
Armament
1x 100 mm howitzer/Skoda vz.1914/19P
2x 75 mm (1xII)
4x 7.92 mm heavy machine gun/Maxim vz.08 (4xI)
from the year 1932:
3x 100mm howitzer/Skoda vz.1914/19P (1xI,1xII)
3x 7.92 mm machine gun/Maxim vz.08 (3xI)
since 1939
+ 1x 13.2 mm machine gun/Vickers (AA)
Crew: 40 men
sources:
http://en.wikipedia.org
http://pl.wikipedia.org/
www.polishnavy.pl
www.rzeczna2004.republika.pl
http://marynarkawojenna.pl/start_n.htm.
type: river monitor
class: Kraków (type 1923)
Building
shipyard: Polskie Fabryki Maszyn i Wagonów L. Zieleniewski With.And., Stocznia in Cracow
the keel laying: 1924
run on water: 1926
completion: 28.08.1926
inclusion in the services: 15.10.1926
sunk: 11.9.1941
Size
max.length: 35,00 m
max.width: 6,00 m
draft: 0.39 m
displacement: 70,3 t (after a conversion of 90 t)
Drive
2x 6-cylinder engine sitting volleyball-Kromhout with a total output of 120 HP
2 screws
max.speed: 6,75 knts (12.5 km/h)
Armament
1x 100 mm howitzer/Skoda vz.1914/19P
2x 75 mm (1xII)
4x 7.92 mm heavy machine gun/Maxim vz.08 (4xI)
from the year 1932:
3x 100mm howitzer/Skoda vz.1914/19P (1xI,1xII)
3x 7.92 mm machine gun/Maxim vz.08 (3xI)
since 1939
+ 1x 13.2 mm machine gun/Vickers (AA)
Crew: 40 men
sources:
http://en.wikipedia.org
http://pl.wikipedia.org/
www.polishnavy.pl
www.rzeczna2004.republika.pl
http://marynarkawojenna.pl/start_n.htm.